4, 8, and 12 Stations
Light Commercial, Commercial
Outdoor
Designed to control commercial irrigation systems with no A.C. power, the Irritrol IBOC® Plus controller operates with a battery or it’s optional SPC-2 solar power converter. For dependable performance in commercial applications, the IBOC® Plus comes with features like a steel cabinet and key/lock door and an optional, steel, locking pedastal for free-standing installations.
Built tough and tight for vandal and weather resistance and with the programming flexibility for irrigating demanding landscapes, the Irritrol IBOC® Plus is the commercial grade controller to specify when there is no A.C. available.
This battery-operated hybrid controller also offers a solar option for the ultimate in installation versatility.
Key Features
Battery, 6 V dc power or optional solar power
Commercial-grade, lockable steel cabinets and pedestals
Three independent programs
Odd/even-day calendar with day exclusion; seven-day calendar; or one to 62 skip days
Non-volatile memory retains all program data
Additional Features
Solar power converter can be mounted up to 80 feet (24 meters) from IBOC Plus (SPC-2 option)
Programmable “Rain Delay” postpones automatic operation for up to 30 days
Program review and erase
Large, easy-to-read LCD displays English or Spanish
One- to 10-minute programmable test cycle
Fully programmable manual cycle acts like a fourth temporary program
Selectable, programmable master valve
365-day calendar with automatic leap year adjustment
Start-time stacking within each program
Station stacking for up to three stations plus master valve at one time
Enhanced lightning protection
Water budgeting
Electronic circuit breaker detection for open and shorted conditions
Battery capacity displayed in remaining percentage
Optional rain sensor input selectable by program
Operating Specifications
Station run times: 1-minute to 23 hours, 59 minutes
Start times: 8 per program for up to 24 daily starts
Watering schedule: 7-day calendar, odd/even date day exclusion or 1-62 skip days